FO 08 Electrical Site Pre-Start Checklist - TAS

Invalid Input

Invalid Input

Invalid Input

Complete the following individual check list before commencement, If answering No, give reasons or instructions below

Conducted site hazard/risk assessment?
Invalid Input

SWMS Available on-site and hazards are controlled as/SWMS?
Invalid Input

JSEA is available to cover new hazards/risks as required
Invalid Input

Personal Protective Equipment on Site?
Invalid Input

First Aid available and accessible?
Invalid Input

Safety Signs and Barricades available for use if necessary?
Invalid Input

Site safe, and ready to start work?
Invalid Input

Work carried out at above address complies with the following Act, Regulations, Australian Standards and appropriate Code of Practice relevant to the tasks (Refer SWMS)

Invalid Input

Full Names of those present

Invalid Input

Invalid Input

Invalid Input

Invalid Input

I hereby Consent that I have carried out the Prestart Checklist, FO8, with the above-mentioned personnel and authorise work to commence.

Invalid Input

WHSE HAZARD & RISK ASSESSMENT CHECKLIST

Access to work area is clear and free of debris
Invalid Input

Invalid Input

Trip hazards are identified
Invalid Input

Invalid Input

PPE available and appropriate for task As or SWMS
Invalid Input

Invalid Input

Fall protection in place
Invalid Input

Invalid Input

All voids are covered, or barriers are in place
Invalid Input

Invalid Input

Overhead Obstacles, Scaffold, Structures
Invalid Input

Invalid Input

Tools and equipment are in a safe condition
Invalid Input

Invalid Input

Overhead Services
Invalid Input

Invalid Input

Underground Services
Invalid Input

Invalid Input

Flammable material
Invalid Input

Invalid Input

Other Trades
Invalid Input

Invalid Input

Vehicle Movement / Traffic Control identified
Invalid Input

Invalid Input

Plant / procedures in place, prestart, logbook
Invalid Input

Invalid Input

Weather conditions
Invalid Input

Invalid Input

SDS's available for products used.
Invalid Input

Invalid Input

Dust
Invalid Input

Invalid Input

Barriers / Signage
Invalid Input

Invalid Input

Excavations
Invalid Input

Invalid Input

Lighting
Invalid Input

Invalid Input

Lock out Kit, on-site and complete
Invalid Input

Invalid Input

All Lock out Mechanism and tags are in place or undamaged
Invalid Input

Invalid Input

Test Equipment is on site and calibration dates are current
Invalid Input

Invalid Input

Invalid Input