FO 08 Construction Site Pre-Start Checklist - TAS

Invalid Input

Invalid Input

Invalid Input

Complete the following individual check list before commencement, If answering No, give reasons or instructions below

Conducted site hazard/risk assessment? *
Conducted site hazard/risk assessment?
Invalid Input

SWMS or JSEA developed and available on-site?*
SWMS or JSEA developed and available on-site?
Invalid Input

Hazards are controlled as/SWMS and/or JSEA?*
Hazards are controlled as/SWMS and/or JSEA?
Invalid Input

Personal Protective Equipment on Site and appropriate for tasks as per SWMS?*
Personal Protective Equipment on Site and appropriate for tasks as per SWMS?
Invalid Input

First Aid available and accessible?*
First Aid available and accessible?
Invalid Input

Site safe, and ready to start work?*
Site safe, and ready to start work?
Invalid Input

Work carried out at above address complies with the following Act, Regulations, Australian Standards and appropriate Code of Practice relevant to the tasks (Refer SWMS) WHS Act 2012, Part 2 - Health and safety Duties; WHS Regulations 2022, Chapter 3 - General risk and Workplace Management

Invalid Input

Full Names of those present

Invalid Input

Invalid Input

Invalid Input

Invalid Input

I hereby Consent that I have carried out the Prestart Checklist, FO8, with the above-mentioned personnel and authorise work to commence.
I hereby Consent that I have carried out the Prestart Checklist, FO8, with the above-mentioned personnel and authorise work to commence.

Invalid Input

WHSE HAZARD & RISK ASSESSMENT CHECKLIST

Access to work area is clear and free of debris*
Access to work area is clear and free of debris
Invalid Input

Invalid Input

Trip hazards are identified*
Trip hazards are identified
Invalid Input

Invalid Input

Safety switches checked for operation*
Safety switches checked for operation
Invalid Input

Invalid Input

Fall protection in place*
Fall protection in place
Invalid Input

Invalid Input

All voids are covered, or barriers are in place*
All voids are covered, or barriers are in place
Invalid Input

Invalid Input

Overhead Structures, Scaffold - strike injuries*
Overhead Structures, Scaffold - strike injuries
Invalid Input

Invalid Input

Tools and equipment are in a safe condition*
Tools and equipment are in a safe condition
Invalid Input

Invalid Input

Overhead Services*
Overhead Services
Invalid Input

Invalid Input

Underground Services - electrical, gas, water*
Underground Services - electrical, gas, water
Invalid Input

Invalid Input

Flammable material*
Flammable material
Invalid Input

Invalid Input

Other Trades on site, conflict*
Other Trades on site, conflict
Invalid Input

Invalid Input

Vehicle Movement / Traffic Control required*
Vehicle Movement / Traffic Control required
Invalid Input

Invalid Input

Plant prestart procedures in place, logbook*
Plant prestart procedures in place, logbook
Invalid Input

Invalid Input

Weather conditions*
Weather conditions
Invalid Input

Invalid Input

SDS's available for products used.*
SDS's available for products used.
Invalid Input

Invalid Input

RCS present/caused from work to be carried out*
RCS present/caused from work to be carried out
Invalid Input

Invalid Input

Barriers / Signage in place*
Barriers / Signage in place
Invalid Input

Invalid Input

Excavations*
Excavations
Invalid Input

Invalid Input

Lighting*
Lighting
Invalid Input

Invalid Input

Environmental Issues*
Environmental Issues
Invalid Input

Invalid Input

Asbestos*
Asbestos
Invalid Input

Invalid Input

Exposed re/bar, steel capped*
Exposed re/bar, steel capped
Invalid Input

Invalid Input

Electrical Isolation*
Electrical Isolation
Invalid Input

Invalid Input

Psychosocial possible issues?*
Psychosocial possible issues?
Invalid Input

Invalid Input

Invalid Input