This package Consists of the Main Manual plus the SWMS suitable for Plasterers.
The main manual includes information such as Policies, emergency contacts, and reference material vital for you and your employees while on the job site.
The following Safe Work Method statements will be included:
- Manual handling
- Loading / unloading
- Electrical safety, Power tool use, Electric mixer use
- Working at heights
- Scissor lift / EWP operation
- Ladder use
- Working on scaffold
- Confined space
- Suspended ceiling, grid system installation
- Steel stud and track framing
- Installation og gyprock walls and insulation
- Plaster rendering
- Working with asbestos
- Working with hazardous substances
Additional SWMS can be added as required to suit your line of work. Please refer the list of SWMS under OUR SERVICES, or in the contact form just request what you need and we will make it happen for you.